Open Accessibility Menu
Hide

Expansion FAQ

CCMH Expansion Project

Remodel graphicCCMH recently completed a three-year, $68 million expansion project, which includes a surgical service department, main lobby and Administration areas, extensive interior remodeling, a 3.5 level, 273-space parking structure and an unfinished second floor to accommodate future growth.

Project scope

Phase 1

  • New parking structure with 294-spaces and 3.5 levels capable of supporting one additional level
  • Covered walk from parking garage to the main entrance


Phase 2

  • Three level hospital addition capable of supporting three additional levels
  • Ground level will house Administration, Human Resources, Education, Community Relations, Patient and Guest Services, expansion of Materials Management, Nutrition Services and space for Dining room expansion
  • First floor consists of inpatient and outpatient surgery, three equipped and one unequipped operating rooms, endoscopy, PACU, Recovery, Central Sterile and Reception.
  • Second level shell will have space for a 36-bed Medical/Surgical unit
  • The new construction will total approximately 137,000 square feet
  • A helipad, with elevated walkways and stair/elevator addition will be constructed on top of the existing Ambulance Bay and will consist of approximately 4,600 square feet


Phase 3

  • Approximately 35,100 square feet of renovation.
  • Ground level work includes Materials Management, Dining Room and support space modifications
  • First level includes patient registration, retail pharmacy, Walk-in Clinic, Gift and Coffee shop and finish upgrades in the lobby
  • Second level includes a connector and lobby finish upgrades
  • Third and fourth levels consist of finish upgrades in the elevator lobby
  • Fifth level consists of remodeling outpatient Behavioral Health, reconfiguring inpatient Behavioral Health and finish upgrades in the elevator lobby